Auto >> AutoSPT >  >> Electric car

What is involved in switching a 74 350 into 89 gmc truck with bad it?

Parts Needed:

- 74 350 SBC motor

- Motor mounts

- Transmission (if not swapping to a 700r4)

- Driveshaft

- Radiator

- Engine wiring harness

- Fuel system (fuel tank, fuel pump, fuel lines)

- Exhaust system

- Cooling system (water pump, thermostat, radiator hoses)

- Ignition system (distributor, spark plugs, spark plug wires)

- Starter

- Alternator

- Power steering pump

- AC compressor (if desired)

Procedure

1. Remove the old engine.

- Disconnect the battery.

- Drain the coolant and oil.

- Remove the driveshaft.

- Remove the transmission or torque converter.

- Remove the motor mounts.

- Lift the engine out of the truck.

2. Install the 74 350 SBC motor.

- Place the engine in the truck and secure with the motor mounts.

- Attach the transmission

- Connect the driveshaft.

3. Install the radiator.

- Mount the radiator in place and connect the radiator hoses.

4. Install the engine wiring harness.

- Locate the engine wiring harness connectors.

- Install the 700r4 harness if swapping transmissions

- Connect the wiring harness to the engine and ignition system.

5. Install the fuel system.

- Install the fuel tank and connect the fuel lines.

- Install the fuel pump.

6. Install the exhaust system.

- Install the exhaust manifolds or headers.

- Install the exhaust pipe and muffler.

7. Install the cooling system.

- Install the water pump.

- Install the thermostat and radiator hoses.

- Install coolant.

8. Install the ignition system.

- Install the distributor.

- Install the spark plugs and spark plug wires.

- Install the coil.

- Connect the ignition switch to the coil.

- Connect the battery.

9. Install the starter.

- Mount the starter in place and connect the electrical wires.

10. Install the alternator.

- Install the alternator in place and connect the electrical wires.

11. Install the power steering pump.

- Install the power steering pump in place and connect the hoses and fluid.

12. Install the AC compressor.

- If desired, remove the A/C compressor from the donor vehicle and install on your truck.

13. Test the engine.

- Start the engine and check for leaks.

- Check the engine oil pressure and coolant temperature.

- Test drive the truck to ensure that everything is working properly.