Auto >> AutoSPT >  >> Auto Repair

How do you Replace the left cv joint on a 1989 Honda Accord?

Replacing the left CV joint on a 1989 Honda Accord requires a thorough understanding of the vehicle's components and mechanical skills. Here's a step-by-step guide to assist you in the process:

Caution: Before you begin, ensure that you have the appropriate tools, safety equipment, and replacement parts. Always refer to a reputable repair manual specific to your vehicle for exact specifications and additional instructions.

Materials Needed:

- Replacement CV joint (matching the vehicle's specifications)

- CV joint grease

- Socket set

- Flat-head screwdriver

- Pliers

- Hammer

- Replacement axle nut

Step-by-Step Instructions:

1. Prepare the Car:

- Park the vehicle on a level surface, apply the parking brake, and engage the transmission into gear to prevent rolling.

- Loosen the lug nuts on the wheel where the CV joint needs to be replaced, but don't remove them completely.

2. Jack Up the Vehicle:

- Securely lift the front of the car with a jack until the wheel is several inches off the ground.

- Place a jack stand under the vehicle's frame for additional support.

3. Remove the Wheel:

- Completely remove the lug nuts and take off the wheel.

4. Pry Off the Dust Cap:

- Locate the CV joint dust cap on the inboard side of the wheel hub.

- Use a flat-head screwdriver to gently pry off the dust cap and expose the axle nut.

5. Loosen the Axle Nut:

- Using a socket wrench, loosen but do not remove the axle nut.

6. Detach the Tie Rod End:

- Locate the tie rod end connected to the steering knuckle near the CV joint.

- Using an appropriate socket, remove the bolt holding the tie rod end in place.

- Swing the tie rod end out of the way to have more space to work.

7. Remove the Ball Joint Nut:

- Find the nut securing the ball joint to the steering knuckle.

- Loosen and remove the ball joint nut, but do not disassemble the ball joint yet.

8. Release the Ball Joint:

- Use a screwdriver to pry open the gap where the ball joint connects to the steering knuckle.

- Insert a pry bar or ball joint separator to pop the ball joint out of the socket.

9. Remove Stabilizer Bar Link:

- Unscrew the bolt that connects the stabilizer bar link to the lower control arm.

- Take off the stabilizer bar link.

10. Pull Out Driveshaft:

- Now, pull the driveshaft out of the transmission. Be cautious not to damage the transmission oil seal during the process.

11. Separate CV Joint:

- Remove the circlip that holds the CV joint to the driveshaft.

- Use a hammer to gently tap the driveshaft out of the CV joint.

- Be careful not to damage the splines on the driveshaft.

12. Clean and Lubricate:

- Thoroughly clean the new CV joint and the driveshaft splines with a degreaser.

- Apply CV joint grease liberally to the splines of the driveshaft and the inside of the CV joint.

13. Install CV Joint:

- Slide the new CV joint onto the driveshaft, ensuring the splines align properly.

- Make sure the circlip groove is facing outward.

14. Secure CV Joint:

- Carefully insert the circlip back into its groove to secure the CV joint onto the driveshaft.

15. Reinstall Driveshaft:

- Gently slide the driveshaft back into the transmission.

16. Reconnect Components:

- Reattach the ball joint to the steering knuckle and secure it with the nut.

- Reconnect the tie rod end and tighten the bolt.

17. Reinstall the Wheel:

- Put back the wheel and secure it with the lug nuts. Tighten the lug nuts snugly, but do not fully tighten them yet.

18. Lower the Vehicle:

- Lower the vehicle slowly using the jack and remove the jack stand.

- Once the car is on the ground, fully tighten the lug nuts in a star pattern.

19. Test Drive:

- Take the car for a short test drive to ensure the new CV joint is functioning correctly.

Note: It's essential to be cautious when working with suspension components, and if you're not comfortable with the repair process, it's best to seek assistance from a professional mechanic.